Quote:
Originally Posted by al-Sagar
I give you an insight of Bangladesh's Nuclear Power Programme and Power Gerneration Expanision planning.

bangladesh has developed a power system master plan or PSMP (BPDB, PGCB, Power Division and Japanese consultant developed it), where they have studied the demand forecast upto 2013, the avilabilty of sources of fuel, their reserve etc etc.

according to the PSMP in 2015 BD will require 11,500 MW, in 2020 bd will require 20000 MW and in 2030 BD will require 30000 MW electricity.
Very informative post Sagar bhai. Clearly, even if we use our potential for nuclear energy to the maximum, we'll still have a shortfall of power. How will that be generated? We have been hearing about coal mining projects and a few, expensive renewable energy proposals. Are they likely to come to fruition?